Repost from EarthFirst! Newswire
Roundup of Actions Against Fossil Fuel Infrastructure in Vermont and NY (PHOTOS)
July 7th, 2015from Rising Tide Vermont
* 150+ w/dozens occupying the tracks in Ticonderoga to #StopOilTrains.
* Four arrested blockading VT fracked gas pipeline construction.
* TWAC still locked down to CNG truck on way to IP mill.
Disrupting Vermont Gas Systems
About 30 protesters disrupted work at a Vermont Gas Systems construction site in Williston on Tuesday morning.
Four protesters were arrested on suspicion that they unlawfully trespassed to stop work at the construction site, said Williston police Chief Todd Shepard. Williston police had given protesters until 7 a.m. to move.
Vermont State Police, Essex police and South Burlington police were also on scene. Shepard said about 14 law enforcement representatives had arrived by the end of the protest.
Thomas Buckley, 34, of Westford and Martha Waterman, 25, of Charlotte chained themselves together across a ditch digging machine. Avery Pittman, 25, of Burlington was later also chained to Waterman.
Buckley, Waterman and Pittman were taken into custody before 9 a.m. Grayson Flory, 28, of Los Angeles was also arrested after refusing to leave the site at 310 Hurricane Lane.
All protesters arrested were carried from the site by law enforcement, but they did not actively resist arrest otherwise, Shepard said.
Each protester has been released from police custody and issued a citation to appear on Thursday in Vermont Superior Court in Burlington, Shepard said.
Occupation of the Tracks
Flotilla
from Rising Tide Vermont: More than a hundred people converged in Ticonderoga, NY today for a flotilla and symbolic blockade to #StopOilTrains.
Yesterday marked the second anniversary of the Lac-Megantic oil train disaster, in which a train carrying fracked oil exploded and leveled the small Quebec town, killing 47 people.
In the so-called Champlain valley, tens of millions of gallons of fracked oil are transported annually along the lake, and industry is making plans to start bringing tar sands through.
TWAC Throws Down
from Rising Tide Vermont: “Our friends at the Trans and/or Women’s Action Camp (TWAC) also stopped a truck on its way to deliver compressed fracked natural gas to International Paper. One person has locked their body to the back of the truck preventing it from making a delivery. Fracked gas by truck is just as dirty and dangerous as fracked gas in a pipeline!”
(TWAC is a group of activists who identify as Trans*, Transgender, Genderqueer, and Gender non-conforming as well as anyone who identifies as a woman regardless of whether they were assigned female at birth)
Released from Jail!!!
The four people who were arrested this morning blocking the construction of the fracked gas pipeline have all been released. Please share and donate to our legal fund to support this fierce escalation of resistance against extreme energy! Donate to our legal fund at: http://bit.ly/J7legal
You must be logged in to post a comment.