Tag Archives: Federal Railroad Administration (FRA)

House rejects effort to divert funding from new projects to railroad safety

Repost from NJ.com

House rejects N.J. Rep. Garrett’s effort to divert funding to railroad safety

By Jonathan D. Salant, NJ Advance Media for NJ.com The Star-Ledger, June 05, 2015 at 9:33 AM

WASHINGTON — The U.S. House on Thursday rejected an effort by Rep. Scott Garrett to use some money earmarked for new transit projects to improve safety on existing lines instead.

By a vote of 266-160, the House defeated Garrett’s attempt to amend the transportation spending bill and transfer $17 million to the Federal Railroad Administration’s safety account from the funds earmarked for new construction.

“You wouldn’t put an addition on your house if the roof was caving in,” said Garrett (R-5th Dist.). “So why are we prioritizing new transit projects before funding the safety of our existing lines?”

Garrett’s amendment was supposed by three other members of the state’s congressional delegation, Reps. Tom MacArthur (R-3rd Dist.), Leonard Lance (R-7th Dist.) and Rodney Frelinghuysen (R-11th Dist.). The other eight House members from New Jersey voted no.

“Just this year we have seen two oil train derailments and over a dozen Amtrak-related accidents, including the tragic crash in Philadelphia that claimed eight lives and injured dozens more,” Garrett said. “I am disappointed that the House ignored the call of our constituents by voting against this common-sense amendment.”

The transportation spending bill for the fiscal year beginning Oct. 1 cuts Amtrak funding by $251 million to $1.14 billion. President Obama sought $2.45 billion.

The measure passed the Republican-led House Appropriations Committee one day after the May 12 Amtrak derailment in Philadelphia that killed eight people and injured more than 200.

Union Pacific chief threatens action on oil train brake rules

Repost from Financial Times

Union Pacific chief threatens action on oil train brake rules

Robert Wright in New York, May 31, 2015 4:55 pm
In this photo from Aug. 8, 2012, a Union Pacific train travels in Council Bluffs, Iowa. Union Pacific said Thursday, Oct. 18, 2012, that its third-quarter profit climbed 15 percent because price increases and more automotive and chemical shipments helped the railroad offset a 12 percent drop in coal shipments. The railroad reported $1 billion in net income, or $2.19 per share. That's up from $904 million, or $1.85 per share, a year ago. (AP Photo/Nati Harnik)
In this photo from Aug. 8, 2012, a Union Pacific train travels in Council Bluffs, Iowa. Union Pacific said Thursday, Oct. 18, 2012, that its third-quarter profit climbed 15 percent because price increases and more automotive and chemical shipments helped the railroad offset a 12 percent drop in coal shipments. The railroad reported $1 billion in net income, or $2.19 per share. That’s up from $904 million, or $1.85 per share, a year ago. (AP Photo/Nati Harnik)

The chief executive of Union Pacific, the US’s largest rail network, has vowed legal action over a provision of new rules for oil trains that he says would cost billions of dollars and provide little benefit.

The pledge from Lance Fritz threatens further delay to rules that have already been years in preparation.

The Federal Railroad Administration and Canadian regulators jointly announced the rules less than a month ago to improve the safety of oil movements by rail, which have risen sharply following the surge in US oil and gas production in recent years.

The surge — from only about 1m tonnes of traffic in 2007 to roughly 40m in 2013, the last year for which full data are available — has exposed the shortcomings of existing safety rules for tank cars, with several trains exploding following derailments.

While Mr Fritz said that most of the new provisions were “great regulation”, he criticised provisions demanding that railways start controlling tank cars’ brakes via an electric signal either transmitted wirelessly from the lead locomotive or via electrical wires running along the train.

The new arrangement, known as electronically controlled pneumatic (ECP) braking, is intended to speed up the transmission of the braking command compared with current methods, which rely on pressure changes in a pipe running along the train. That should reduce the number of cars that derail in a crash.

Mr Fritz said, however, that virtually the same improvements could be gained by spacing locomotives out along a train, as Union Pacific frequently does, and the extra benefits of ECP did not justify the costs. The new equipment would cost about $75,000 for each of UP’s 6,500 locomotives, while there would also be substantial costs for fitting out tank cars, nearly all owned by oil shippers or leasing companies.

“The juice isn’t worth the press,” Mr Fritz said. “We think that’s very ill-considered. We provided that feedback and we will continue to provide that feedback.”

The industry could appeal against the rule both through administrative channels and in the courts, Mr Fritz said. “We as an industry are taking that path,” he added.

Railways have been pressing for improvements in tank car design to avoid a repetition of disasters like the Lac-Mégantic explosion in Canada in 2013, in which 47 people died when a poorly secured oil train broke lose, derailed and exploded in the centre of a small town.

Operators are barred from refusing to carry cargo that meets the minimum regulatory requirements but have been concerned that under existing regulations cars were excessively vulnerable in an explosion.

Mr Fritz also criticised the new rules’ standards for thermal protection for cars, meant to prevent their exploding in a fire, saying they were not strict enough.

The Federal Railroad Administration declined to comment publicly on Mr Fritz’s criticisms but looks determined to press ahead with the mandate for ECP brakes.

UP, which has a larger track network than any other US railway, has been a significant beneficiary of the surge in oil movements. Mr Fritz said he expected a strong continuing role for rail in transporting US-produced crude oil.

The sharp fall in the oil price in recent months has shifted traffic away from the routes that UP serves, however, pushing down crude oil movements on its network by 38 per cent in the first quarter compared with last year.

Two-person train crews necessary for safety, lawmakers say

Repost from Lincoln Journal Star

Two-person train crews necessary for safety, lawmakers say

By Zach Pluhacek | Lincoln Journal Star, May 28, 2015 1:45 pm
A BNSF Railway locomotive pulls cars of coal through Lincoln in January. FRANCIS GARDLER/Journal Star file photo

Trains need two-person crews to help prevent disasters like the 2013 derailment and explosion of a crude oil train that killed 47 people in Quebec, some Nebraska lawmakers argued Thursday.

The Federal Railroad Administration has signaled plans to require two-man crews on trains carrying oil and freight trains, which is the industry’s standard practice, but its proposed rule hasn’t been issued.

Rail lines would like to switch to a crew of one on most freight engines as they equip trains with positive train control, a new federally mandated wireless safety system that can force a train to stop automatically to avoid a potential crash.

“This is a risky development for public safety in Nebraska, particularly in light of the hazardous types of freight that are being hauled through our state,” said Sen. Al Davis of Hyannis on Thursday.

Nebraska is home to the nation’s two biggest railroads, Union Pacific, based in Omaha, and BNSF Railway, which is owned by Berkshire Hathaway in Omaha. UP operates the world’s largest railroad classification yard, the Bailey Yard in North Platte, and BNSF has extensive operations in Lincoln and the rest of Nebraska.

Davis sponsored a measure (LB192) this year that would have outright required two-person crews in Nebraska, but it failed to advance from the Legislature’s Transportation and Telecommunications Committee.

Instead, lawmakers passed a nonbinding resolution Thursday that doesn’t specifically call for two-person crews, but it urges the Federal Railroad Administration to adopt a rule that “ensures public safety and promotes the efficient movement of freight, while supporting interstate commerce.”

The resolution (LR338) was adopted on a 36-4 vote.

“These trains are some of the heaviest moving things on this planet, and just having one person in charge doesn’t seem to make sense,” said Sen. Ken Haar of Malcolm, who cosigned the resolution.

But Sen. Tyson Larson of O’Neill argued human mistakes are often to blame when tragedy strikes. “Sometimes true safety does lie within automation,” he said.

Union Pacific opposes the resolution because it falsely implies trains are unsafe and ignores collective bargaining deals that have addressed safe train crew sizes for decades, said spokesman Mark Davis.

Two rail unions —  the Brotherhood of Locomotive Engineers and Trainmen and the International Association of Sheet Metal, Air, Rail and Transportation Workers, which represent about 3,700 active members between them — support the resolution.

Cutting down on the number of crew members would almost certainly affect jobs and reduce the number of workers paying into shared retirement plans.

The more critical issue is what happens when a train derails or breaks down, said Pat Pfeifer, state legislative board chairman for the Brotherhood of Locomotive Engineers and Trainmen.

One crew member has to remain inside the engine at all times, so without a second person, there’s no one available on scene to help cut a crossing or take other emergency precautions.

Both unions are also backing a bill in Congress to require two-person crews.

“It’s about public safety; it’s not about jobs,” Pfeifer said.

Amtrak crash highlights neglect of busy rail corridor

Repost from the Centre Daily Times, State College, PA

Amtrak crash highlights neglect of busy rail corridor

By Curtis Tate, McClatchy Washington Bureau, May 13, 2015
Amtrak Crash
An aerial photo Wednesday, May 13, 2015, in Philadelphia, shows the scene after a fatal Amtrak derailment Tuesday night, in the Port Richmond section of Philadelphia. PATRICK SEMANSKY — AP

— The derailment of an Amtrak train in Philadelphia this week has renewed attention to the safety and infrastructure challenges facing the nation’s busiest passenger rail corridor.

As investigators began reviewing the data from the locomotive event recorder and collecting other key pieces of evidence to determine the cause of the derailment, information emerged Wednesday that the train had been traveling around a sharp curve at twice the posted speed when it left the tracks.

The accident coincided with a debate in Washington over funding for Amtrak. On Wednesday, the House of Representatives Appropriations Committee voted to cut Amtrak’s annual subsidy from $1.4 billion to $1.1 billion. Further, Amtrak’s authorizing legislation expired two years ago and hasn’t been renewed.

Congress funds Amtrak from year to year, making it difficult for the railroad to make needed improvements to aging bridges and tunnels and to the systems that power the trains and keep them out of one another’s way.

“Amtrak’s living on a shoestring,” said Steve Ditmeyer, a former associate administrator for research and development at the Federal Railroad Administration. “Some things are falling through the cracks.”

The seven-car train traveling from Washington to New York derailed after 9 p.m. EDT Tuesday in Northeast Philadelphia. Of the 238 passengers and five crew members on board, seven were confirmed dead Wednesday by Philadelphia Mayor Michael Nutter.

The fatalities included a U.S. naval midshipman and an employee of The Associated Press. The chief executive of an online startup company was missing.

As seen from TV news footage and pictures posted to social media, pieces of the train were strewed askew the track, which bends in a sharp curve in Northeast Philadelphia. Part of the train overturned, and one car was reduced to a twisted heap of shredded metal.

“It’s a devastating scene,” National Transportation Safety Board member Robert Sumwalt said Wednesday morning.

The NTSB confirmed Wednesday afternoon that the train had approached the location of the accident, Frankford Junction, at more than 100 mph. The speed limit there is 50 mph.

Ditmeyer said a Northeast Corridor improvement project in the late 1970s and early 1980s was supposed to straighten out curves, but that got cut from the budget.

Amtrak’s flagship Acela Express has a top speed of 150 mph but rarely reaches it. Numerous curves, bridges and tunnels restrict the speed of all trains on the Northeast Corridor. The speed limit through two tunnels under Baltimore, built in the 1870s, is 30 mph.

According to a five-year plan for the Northeast Corridor published last month, half the line’s bridges were built between 1900 and 1920, and it would take 300 years to replace them at current funding levels.

“These are ancient things,” Ditmeyer said. “They’re well over a hundred years old. They are decaying.”

The twin tunnels under the Hudson River in New York, built in 1910, sustained heavy flood damage from Hurricane Sandy in 2012. Tens of thousands of commuters depend on them every day, and Amtrak President and CEO Joe Boardman has said they need to be replaced soon.

“I don’t know if it’s seven (years). I don’t know if it’s four or less,” Boardman said in an interview last year. “We’ve got to do it. The nation has to do it. We have to find the money.”

Amtrak is in the process of installing a collision-avoidance system by year’s end on the Boston-to-Washington Northeast Corridor. The system, called positive train control, is designed to prevent trains from exceeding speed limits as they approach curves.

Ditmeyer said the Northeast Corridor was long ago equipped with a system called automatic train control. While that system prevents trains from running past stop signals, it doesn’t correct for excessive speed ahead of curves.

Congress mandated positive train control in 2008 for much of the nation’s rail network, and some lawmakers are floating a three- to five-year extension for its installation.

Unlike Amtrak’s long-distance trains, which are diesel powered, the Northeast Corridor is electrified. But the system of overhead wires and supports that supplies power to the trains dates to the Great Depression.

Amtrak’s five-year plan for the corridor says 62 percent of the overhead wires and 42 percent of the steel supports need to be replaced.

The plan also notes that the economic cost of losing service on the Northeast Corridor could reach $100 million a day. As of Wednesday afternoon, Amtrak service was still suspended between New York and Philadelphia.