Category Archives: Uprail communities

Latest Benicia DEIR comments: Center For Biological Diversity, Communities for a Better Environment, Natural Resources Defense Council

On December 16, the City of Benicia released yet another document highly critical of the Valero Crude-by-Rail Draft EIR.  The massive report was submitted for the record on December 5 by the Center for Biological Diversity, Communities for a Better Environment, and Natural Resources Defense Council.  The document focuses on biological resources and climate change.  Many thanks to our friends in these excellent organizations!

The summary page follows:

CBD-CBE-NRDC_lttrhdDecember 5, 2014

Amy Million, Principal Planner
Community Development Department
250 East L Street
Benicia, CA 94510
amillion@ci.benicia.ca.us

Re: The City of Benicia’s Draft Environmental Impact Report for the Valero Benicia Crude by Rail Project

Dear Ms. Million,

On behalf of the Center for Biological Diversity, Communities for a Better Environment, and Natural Resources Defense Council, we submit the following comments on the City of Benicia’s Draft Environmental Impact Report (DEIR) for the Valero Benicia Crude by Rail Project (Project). The Project, if approved, would allow the Valero refinery to receive up to 70,000 barrels per day of crude oil by train, which equates to a potential for 1.07 billion gallons of crude oil imported by train each year.

These comments supplement prior comment letters by detailing the significant deficiencies in the DEIR’s assessment of impacts to Biological Resources in Section 4.2. Specifically the DEIR (1) fails to adequately analyze and mitigate impacts to biological resources at the Project area; (2) fails to adequately analyze and mitigate impacts along the rail lines serving the Project; (3) fails to properly analyze the cumulative impacts of increased crude oil shipments on biological resources; and (4) fails to adequately evaluate impacts related to climate change.

Because this Project would result in significant impacts to biological resources, the City cannot certify the DEIR before adopting all feasible mitigation measures. At present, the DEIR fails to identify and analyze mitigation measures that would reduce the Project’s impacts.

However, there are numerous mitigation measures and alternatives that would reduce the impacts of the Project. These measures must be analyzed in the DEIR, so that the full range of options are publicly disclosed and considered by decision‐makers.

[Editor: The document continues … Note that the “Public Comment” link below goes to a huge 584-page document on the City’s website, a 24mb download.  WordPress will not allow an upload of this magnitude here on The Benicia Independent.  The bulk of the document (570 pages) is supplemental studies, all important, but for the heart of the document, see the 14-page Comment Letter minus the supplements.  – RS)

Public Comments October 17-December 15, 2014  (A single comment letter, from the Center for Biological Diversity, Communities for a Better Environment, and Natural Resources Defense Council.)

VALLEJO TIMES-HERALD: Sacramento-area leaders concerned about crude-rail risks

Repost from The Vallejo Times-Herald

Sacramento-area leaders concerned about crude-rail risks

Uprail communities urge Benicia to address oil train safety hazards
By Tony Burchyns, 08/09/2014

Sacramento-area leaders are voicing concerns about Valero’s proposed crude-by-rail plan, accusing Benicia of paying too little attention to potential “very serious” hazards of increased oil train shipments through Placer, Sacramento, Yolo, Solano and Contra Costa counties.

In a draft comment letter on the project, the Sacramento Area Council of Governments last week sharply criticized a Benicia study that found that the crude oil trains rattling through cities and sensitive habitats would pose no “significant hazard” whatsoever.

“We believe that conclusion is fundamentally flawed, disregards the recent events demonstrating the very serious risk to life and property that these shipments pose, and contradicts the conclusions of the federal government, which is mobilizing to respond to these risks,” the letter states.

In May, the U.S. Department of Transportation found that crude-by-rail shipments pose an “imminent hazard,” based on a recent pattern of fires and spills involving crude oil shipments from the Bakken oil fields of North Dakota.

The letter urges the city to “substantially revise” the project’s draft environmental impact report “so that it will fully inform the public and the City Council of the full impacts.”

Valero is proposing daily shipments of up to 70,000 barrels of crude to its Benicia refinery. The tank cars would originate at unspecified North American sites and be shipped to the Union Pacific Railroad’s Roseville yard, where they would be assembled into two daily 50-car trains to Benicia.

Last month, Benicia officials extended the public comment period on the project’s draft environmental impact report to Sept. 15.

The council — which represents six counties and 22 cities in the Sacramento region — is set to approve its draft letter later this month. Meanwhile, the Yolo-Solano Air Quality Management District, Yolo County Board of Supervisors and Caltrans separately have submitted comment letters to Benicia expressing concerns about the project.

Yolo County officials contend that Benicia’s project analysis “provides only a brief review of the environmental, safety, and noise effects on upstream communities.”

“All areas along the route will have the same trains traveling on them,” the Yolo County officials wrote. They added that potential risks to all communities along the rail line should be studied.

The Yolo-Solano Air Quality Management District recommended that the city offset increased air emissions from locomotives by supporting clean-tech programs in the region. The district also faulted the city for not studying the project’s cumulative air pollution effects throughout Sacramento and Yolo counties, as well as parts of Placer, El Dorado, Solano and Sutter counties.

Caltrans focussed its concerns on how oil train deliveries would impact Interstate 680 near the Bayshore Road off-ramp. They recommend safety measures — including rail signals — at the Bayshore Road crossing to prevent freeway backups during peak commute hours.

The agency also requested that a mechanism be put in place to advise Caltrans directly of any accidents affecting the freeway.

Benicia Senior Planner Amy Million said the city would respond to all valid project concerns following the close of the public comment period. The next public hearing on the project is set for 7 p.m. Thursday at City Hall, 250 E. L St.

Open letter from Davis to Benicia: Stop crude by rail

Repost from The Benicia Herald
[Editor: A year ago, almost to the day, I wrote an Op-Ed for The Benicia Herald titled, “Valero crude-by-rail: ‘Down-wind’ and ‘up-rail’.”  A few months later, I was contacted by Milton Kalish and Lynne Nittler of Davis, and we’ve stayed in touch.  They – and their wonderful group of activist friends in Cool Davis, Yolano Climate Action and 350 Sacramento – have continued their CBR organizing efforts with great energy and creativity.  This open letter by Lynne serves as a detailed primer of all the reasons why CBR must be stopped.  A must-read.  – RS]

Open letter to Benicia: Stop crude by rail

July 10, 2014 by Lynne Nittler

IN RESPONSE TO JIM LESSENGER’S OPED OF JULY 4, “Open letter to the City Council: Support CBR,” I write today urging Benicia to deny the proposed Valero Refinery Crude-by-Rail Project until all safety measures listed below are in place.

I have been carefully following the proposed Benicia project, reading articles from a wide variety of sources including many reports and, most recently, the Draft Environmental Impact Report.

I follow a number of environmental topics closely, particularly those related to climate change. I am on the board of Cool Davis, a nonprofit organization that helps the city of Davis implement its Climate Action and Adaptation Plan.

I have an “uprail” perspective that is important to add to the conversation on the Valero proposal, as the impact of the daily trains would be significant in my community.

I have six reasons Benicia should deny the CBR project. They are as follows:

1. The project is far from contained within Benicia’s 3,000-acre Industrial Park.

Benicia is fortunate to have a buffer area of industries and vacant land around Valero Benicia Refinery. Valero has even promised that the oil trains will not cross city streets during Benicia’s rush hours (though neither Valero nor the city of Benicia can enforce that promise).

Davis and other uprail communities are not so fortunate. The trains will pass through downtown Davis, including residential neighborhoods, the center of downtown, university housing and the entire Mondavi Performing Arts Complex and Conference Center.

Train travel through Davis is made more dangerous because there is a curve with a 10-mph left-handed cross-over between the main tracks several hundred feet east of the Amtrak station, right downtown. All other crossovers on the line are rated for 45 mph. This 10-mph spot in particular is an accident waiting to happen.

While the trains would hopefully avoid rush hour in Benicia, that will surely not be the case for all uprail communities.

2. Valero owns the property but should not be allowed to set profits ahead of public health and safety.

No corporation operates in a vacuum. Valero’s decision to import North American crude has profound effects beyond its own improvement that cannot be ignored.

Valero’s change to crude by rail from crude by ship would allow it to import both Canadian tar sands and Bakken crude, and would add additional dangerous trains to the tracks all the way back to their points of origin, most likely in North Dakota or Alberta, Canada. That means the trains endanger and disrupt towns and cities across our country on their way to Benicia. These tracks are already impacted by oil trains taking precedence over trains transporting grain and other local crops and commuter trains. More importantly, people are endangered by the highly volatile Bakken crude — there have been 12 significant derailments since May 2013, with six explosions — and our precious marshes and waterways are threatened by the possibility of toxic spills of tar sands bitumen, which quickly sinks to the bottom and cannot be removed. The Kalamazoo River, Mich. cleanup of 1 million gallons of leaked tar sands dilbit is still unsuccessful after four years and $1 billion.

In California, the trains would come over the Sierra Nevada Mountains or wind through the Feather River Canyon (rated as a “rail high-hazard area” by the California Governor’s Office of Emergency Services), or possibly even come from Oregon down through Redding and Dunsmuir, site of a 1991 derailment of a fertilizer tank car that killed fish for 40 miles. In any of these routes, major rivers would be crossed where an accident could contaminate much-needed drinking and irrigation water.

3. The project will clearly affect the environment.

A wider view of “environment” raises serious concerns. California considers the cradle-to-grave lifecycle of products. Extracting, refining and burning heavy, sour crude is a nasty job, start to finish.  That’s why tar sands is called a “dirty” fossil fuel, noted for its energy-intensive carbon footprint. This deserves a full discussion which is beyond the scope of this letter. The recently completed Valero Improvement Project was intended to allow the refinery to handle refining the heavy, sour crude as efficiently as possible, which is laudable, but that is not to say it is a clean process. Setting aside the forests destroyed and the unlined toxic tailing ponds leaking into the waterways in Canada at the point of extraction, we must note that processing tar sands bitumen will produce more of the byproduct petcoke that is so polluting it cannot be burned in the U.S. (It can be sold abroad and burned for energy there. Ironically, when it is burned in China, some of the smog blows back across the ocean to Southern California.)

The heavy crude is high in sulfur and toxic metals, which corrode refinery pipes. The Richmond refinery fire in 2010 was traced partly to corrosion from refining tar sands. Emissions must be carefully monitored to ensure toxic fumes do not escape to neighborhoods or endanger workers.

The 2003 “improvement” project enabling Valero to refine heavy crude opened the door for California to refine more of the world’s dirtiest bitumen, running contrary to our state goals under AB 32 to conserve energy and reduce our greenhouse gas emissions by moving to renewable energy sources. In fact, according to California Energy Commission figures, California reduced its total consumption of oil from 700 million to 600 million barrels in the last year, primarily through conservation — i.e., adopting lower-emissions vehicles and Energy Star appliances, changing transportation habits to walk-bike-public transport, and making our buildings more energy efficient. We are moving away from our dependence on oil by reducing our consumption of it.

4. The project will be safer, but not safe.

The outgoing chair of the National Transportation Safety Board (NTSB) has some strong words for the rail industry and the way certain hazardous liquid is transported.

Deborah Hersman’s strong remarks are tied to older-model rail tank cars known as DOT-111s, which carry crude oil and ethanol through cities across the U.S. and Canada. Hersman told an audience that DOT-111 tank cars are not safe enough to carry hazardous liquids — in fact, she said her agency issued recommendations several years ago. “We said they either need to remove or retrofit these cars if they’re going to continue to carry hazardous liquids,” Hersman said on April 22, 2014.

Right now, four California legislators are urging the Department of Transportation to take action on critical safety measures. After a hearing of the joint houses of the Legislature on June 19 chaired by Sen. Fran Pavley, D-Agoura Hills, Congressmembers John Garamendi, D-Davis, Doris Matsui, D-Sacramento, Mike Thompson, D-Napa, and George Miller, D-Martinez, sent a letter to Anthony Foxx, secretary of the U.S. Department of Transportation, stating that “we cannot allow communities to be in danger when viable solutions are available.”

The summary of their requests, dated July 1, 2014, is as follows:

• Provide a report on the level of compliance by the railroad and petroleum industry to the May 7 Emergency Order.

• Issue rulemaking that requires stripping out the most volatile elements from Bakken crude before it is loaded onto rail cars.

• Expedite the issuance of a final rulemaking to require the full implementation of the Positive Train Control (PTC) technology for all railroads transporting lighter crude, and provide a status report on the progress of PTC implementation to date.

• Expedite the issuance of rulemaking that requires phasing out old rail cars for newer, retrofitted cars.

The Benicia decision comes at a critical moment. Benicia’s approval of the Valero proposal before DOT takes action would undercut what our legislators are trying to do to protect not just Benicia citizens, but all uprail citizens all across the U.S. Regulating that the volatility of crude be reduced will force the industry to build small processing towers — aptly called stabilizers — that remove natural gas liquids (a product that can be saved and sold) from the crude before it is loaded, as they do in other parts of the country (Eagle Ford shale reserves in Texas, for example).

Obviously, creating this necessary infrastructure will increase the cost of Bakken crude. The industry will no doubt balk at the additional expense, as will the refineries. On the other hand, it’s immoral to expose many millions to explosive trains of Bakken crude when there is a remedy! One Lac-Mégantic tragedy is enough.

The trains rumbling into Benicia are the first trains to pass daily through our region to the Bay Area, but others will follow. The approval of this project cannot be viewed in isolation. This fall the DEIR will be available for review for the Phillips 66 Santa Maria Refinery Rail Spur Project that would bring another daily train through my community in Davis, through yours in Benicia, across the aging Benicia rail bridge, along the beautiful Carquinez Strait, through the East Bay and on down the Capitol Corridor to San Luis Obispo County. Based on California Energy Commission data, the Sacramento Bee says we can expect five to six trains daily in the next few years as California receives 25 percent of its crude by rail.

We put ourselves at grave risk to proceed with any rail projects now until we firmly lock in place the safety measures requested by our U.S. congressmembers. In this country, protection for the public must come first.

5. The CBR proposal makes no economic sense for Benicia and for the nation.

We live in a WORLD economy. Rather than destined for domestic purposes, the refined oil from all five Bay Area refineries is sold on the world market for greatest profit. That’s why gasoline rates at the pumps have not decreased during this oil boom.

Considered from the perspective of the weather of our planet, which will become a pivotal concern in the coming years, it makes no sense, financial or otherwise, to extract another drop of fossil fuel from the Earth. We need to put all our attention on renewables and conservation, and cut back drastically on our oil consumption. Realistically, this means refineries will need to produce far fewer products, and the oil extraction frenzy will die down.

6. The Valero refinery cannot befriend Benicia and then turn around and foul the air, risking the health and safety of our children.

Valero may mean well when it makes charitable contributions, but its intentions mean little if it then creates unsafe conditions for those who are in receipt of its generosity. It is not surprising that salaried employees, wage earners and grant recipients would stand up in favor of most anything proposed by the “friendly giant.” But it is incumbent on us all to look at the big picture — and a big picture that contains oil trains is not a pretty one.

In summary, I recommend a “no” vote on the Valero Crude-by-Rail Project until all safety measures requested by our four local congressmembers in Washington are firmly in place, and enough new tank cars are designed and produced to safely convey the crude oil from its source to Benicia, ensuring that no communities or waterways are in danger.

This “no” vote would send a strong message to DOT that their work is urgent, and that the regulations they make will be closely monitored. A “yes” vote, however, would undercut the important work our legislators are doing on our behalf.

Lynne Nittler lives uprail from Benicia in Davis. She devotes much of her time to Cool Davis, a nonprofit that focuses on helping Davis reduce its greenhouse gas emissions, adapt to a changing climate and improve the quality of life for all. She has followed the oil train issue closely since last September.

Davis holding 2 more Workshops: How To Respond to Draft EIR – July 3 & July 8

Repost from Yolano Climate Action (Google Group)

Monday, June 30, 2014
Subject: two upcoming oil train EIR workshop opportunities July 3 & 8

Public Workshop 2 – Responding to Draft Environmental Impact Report on Crude-by-Rail Oil Trains through Davis

 Thursday, July 3 and Tuesday, July 8
7:00-9:00 p.m.
The Blanchard Room at the Davis Branch Library

Bring questions, ideas for topics, drafts and laptops
Bring a friend!  Every letter adds impact!
Exercise your civic rights with written comments!

Homework for July 3 and 8:

  1. If you have a little time – Go to www.benindy.wpengine.com and browse to get an overview of the project, the EIR (table of contents), news article titles since last August, and how to submit your comments.  You’ll have fun and get ideas for what aspect you want to address in your response.
  2. If you have more time:  pick an idea you might want to write about, such as liability issues in the event of an accident or spill, or the regional impact of one train of 100 cars each day; how to weigh risk vs benefit and how this project measures up, etc.    Then look through the DEIR report (posted at www.benindy.wpengine.com) for a section that might address your topic and read it. See if you spot faulty reasoning, or important concepts that are missing, etc.  Jot down notes or make a rough draft.  It will be most effective if you can cite evidence!
  3. If you can’t resist going deeper, or you have a knack for reading EIR reports, plunge in wholeheartedly and tackle as much as you wish.   Your letter can address more than one point, but again, the more serious and thoughtful each point is, the better. Clearly separate each point you want to make.

Agenda for July 3 and 8

  1. Updates
  2. Check-in
    • —-Who has a draft for feedback?
    • —- Who has an idea?  Needs suggestions for development?  Evidence?  Where it fits in the EIR?
    • —-Who needs an idea for a response?
  3. Working together or in groups
  4. Other assignments
    • —-Write to federal senators and congressional reps (testing the crude & reducing the volatility, tank car safety standards, train speeds, right-to-know issues, ideas from NRDC testimony, etc.)
    • —-Sign up to gather signatures.
    • —-Send model letters to us to use as models for others writers.
  5. Join the nation-wide actions commemorating the one-year anniversary of the Lac-Megantic crude-by-rail derailment and explosion.  In Davis, make a sign “Stop Crude by Rail” and join others at the Amtrak station on July 9th at rush hour.  Contact Reeda Palmer for details at reedajpalmer@aol.com
  6. Carpool to the Benicia Planning Commission Public Hearing on the Valero DEIR on July 10, 7pm, Council Chambers, City Hall,250 East L Street, Benicia.  Up-rail participants are needed to show the regional impact of the project.

Contact:  Lynne Nittler at lnittler@sbcglobal.net
Yolano Climate Action the go to place for climate activism in Yolo and Solano Counties