Tag Archives: Rail infrastructure

To boost the safety of moving oil by rail, focus on the tracks, paper argues

Repost from the Houston Chronicle

To boost the safety of moving oil by rail, focus on the tracks, paper argues

Infrastructure report says broken rails and human error are also problems as shipments of crude increase

By Jennifer A. Dlouhy, August 6, 2015
A train hauls crude oil in Seattle last month. Railroads and regulators can leverage technology to make existing inspection programs more efficient and effective, says a white paper by the Alliance for Innovation and Infrastructure.on Wednesday, July 15, 2015. The highly controversial trains haul rail cars loaded with oil brought from the oil fields of North Dakota and Montana. (Joshua Trujillo, seattlepi.com) Photo: JOSHUA TRUJILLO / SEATTLEPI.COM
A train hauls crude oil in Seattle last month. Railroads and regulators can leverage technology to make existing inspection programs more efficient and effective, says a white paper by the Alliance for Innovation and Infrastructure.on Wednesday, July 15, 2015. The highly controversial trains haul rail cars loaded with oil brought from the oil fields of North Dakota and Montana. (Joshua Trujillo, seattlepi.com) Photo: JOSHUA TRUJILLO / SEATTLEPI.COM

WASHINGTON – More can be done to boost the safety of moving oil by rail by focusing on the tracks themselves, according to a white paper released Thursday by a group promoting infrastructure investments.

New rules requiring more resilient tank cars are an important step, the Alliance for Innovation and Infrastructure said, but regulators, railroads and shippers now need to do more to combat the leading cause of derailments, including broken rails and human error.

From integrity sensors to measurement systems, an array of technologies can help ensure tracks are sound, said Brigham McCown, chairman of the alliance and a former head of the Pipeline and Hazardous Materials Safety Administration.

‘Proactive engagement’

“We tend to be reactionary. Something happened, so what are we going to do to fix it?” McCown told reporters Thursday. “We focus on the accident, rather than focusing on a long-term proactive engagement of reducing the potential for accidents to begin with.”

The issue has drawn attention amid a surge in oil-by-rail traffic. As trains carry crude across the United States to refineries and ports, there has also been a series of fiery derailments involving tank cars carrying that hazardous material.

Over 22 pages, the alliance’s white paper makes the case that railroads and regulators can leverage technology to make existing inspection programs more efficient and effective.

Existing regulations, updated in 2014, already mandate both track and rail inspections – the former often entails workers examining the physical conditions of track structures and the roadbed by foot or by vehicle, with that monitoring required as frequently as weekly in some cases. Rail inspections use ultrasonic or induction testing to identify hidden internal defects, with their timing generally pegged to the amount of traffic on rail segments.

The Federal Railroad Administration also requires other probes, including monthly inspections of switches, turnouts, track crossings and other devices.

Constant inspections

Many railroads go above and beyond those inspection requirements.

“Freight railroads spend billions of dollars every year on maintaining and further modernizing the nation’s rail network, including safety enhancing rail infrastructure and equipment,” said Ed Greenberg, a spokesman for the Association of American Railroads. “At any point during the day or night, the nation’s rail network is being inspected, maintained or being upgraded.”

But the infrastructure alliance reiterates a previous assertion by the National Transportation Safety Board, that track inspections are undermined when a single worker can inspect multiple lines at the same time, as currently allowed.

And McCown emphasized that existing technology can boost the odds of catching broken rails and other problems before an accident.

Senate Republicans pushing 3-year delay for rail safety System

Repost from the New York Times

Senate to Debate 3-Year Delay for Rail Safety System

By Michael D. Shear, July 23, 2015
An Amtrak Acela train in New York bound for Pennsylvania Station. Amtrak has said it will complete installation of an advanced safety system for its trains in the Northeast Corridor by the current December 2015 deadline. Credit David Boe/Associated Press

WASHINGTON — Two months after the high-speed derailment of an Amtrak train killed eight people and injured hundreds more in Philadelphia, a Senate transportation bill headed for debate this week calls for a three-year delay of the deadline for installing a rail safety system that experts say would have almost certainly prevented the Pennsylvania accident.

Lawmakers from the Northeast and train safety experts expressed outrage over the provision, which is included in the 1,000-page legislation to finance highway and transit projects for the next three years. Several lawmakers vowed to fight the extension of the deadline to install the safety system, called positive train control, beyond December 2015.

“It should be done immediately. There shouldn’t be an extension,” said Senator Chuck Schumer, Democrat of New York. “Given the high number of accidents, and given the fact that P.T.C. is really effective, they should stick with 2015.”

Senator Richard Blumenthal, Democrat of Connecticut, said he was “deeply disturbed about yet another delay in a potential safety measure” until December 2018 and said the provision in the transportation bill “essentially makes the deadline a mirage.”

In 2008, after decades of delay, lawmakers gave railroad companies, including Amtrak, seven years to complete installation of the safety system, which monitors the speed of trains and automatically slows them down if they approach curves at dangerously high speeds.

The Amtrak train that derailed in Pennsylvania was going 106 miles an hour, more than twice the speed limit, when it careened off the tracks.

Since the accident, Amtrak has said it will meet the existing deadline for installing and activating the safety systems in the busy Northeast Corridor. Craig S. Schulz, a spokesman for the railroad, said Thursday that Amtrak “remains committed” to making good on that promise.

But many railroads across the country still have not installed and activated the necessary equipment and would face federal fines and other mandates if they continued operating past Dec. 31 without it.

The transportation spending measure in the Senate would require railroads to submit plans to the secretary of transportation that include installation of positive train control by the end of 2018.

The willingness to give railroads more time is especially galling to lawmakers from the Northeast, where the Pennsylvania accident highlighted the dangers to millions of riders in the most heavily traveled train corridor in the nation.

Mark V. Rosenker, a former chairman of the National Transportation Safety Board, which investigates train accidents, said he was outraged by the provision and blamed railroads’ lobbyists for pressuring lawmakers to include it.

“Obviously, the railroad lobbyists have gotten to Congress,” Mr. Rosenker said. “We just had a horrible accident. People died and people ended up becoming paralyzed when that technology was available to the railroad. I am very disappointed.”

Senator Bob Casey, Democrat of Pennsylvania, also commented on the timing of the proposal. “The idea that a provision to delay positive train control was slipped into this bill just a short time after the Amtrak 188 derailment is shocking and wrong,” he said. “Delaying P.T.C. is a bad idea, and this provision should be stripped out immediately.”

Officials at the Transportation Department are continuing to insist that railroads meet the current end-of-the-year deadline. And at the White House, the press secretary, Josh Earnest, spoke of concerns “about some of the safety provisions that are included in the bill” and said the administration would take a close look at those provisions.

But pressure is mounting in both parties to pass the transportation bill before the Highway Trust Fund runs out of money for road projects across the country. That could happen this summer if Congress does not approve a new long-term authorization for transportation spending. If the Senate passes its measure, it still must win passage in the House as well.

Several senators said concern about the rail safety provision could become a central part of the debate over the bill in the days ahead. Mr. Blumenthal said he disliked the language extending the deadline for railroads to install positive train control.

But in an interview, he said he might be able to accept a new deadline if Congress agreed to dedicate money from the Highway Trust Fund specifically for installation of the rail safety systems, especially for commuter train systems that are struggling to afford the equipment.

Mr. Blumenthal said he intended to propose amendments that would dedicate $570 million a year for three years to commuter-rail safety improvements. He said it was unclear whether Republicans, who control the Senate, would allow the amendments to be offered. And he said it was not certain how hard the Obama administration was willing to fight for them.

“I’m hoping they will lend the full weight of their authority,” he said. “It would make a difference.”

Backers of the deadline extension say they need it because the equipment is costly and time-consuming to install across thousands of miles of track.

They also say the provision gives the transportation secretary authority to reject railroad improvement plans on a case-by-case basis, which they said could leave some railroads subject to the current 2015 deadline. And they said the bill authorized the Transportation Department to prioritize money for rail safety even though it does not guarantee a specific amount of money to be spent from the trust fund.

Ed Greenberg, a spokesman for the Association of American Railroads, which represents freight and commuter systems, praised the provision, saying in a statement that it “sets a rigorous case-by-case framework with enforceable milestones that guarantees sustained and substantial progress, complete transparency and accountability, and a hard end date for full installation by 2018.”

But advocates of greater safety measures for trains said the railroads had been under orders to upgrade their safety systems for years and should have been able to meet the 2015 deadline, which was set by Congress after a California derailment in 2008 that killed 25 people.

Mr. Rosenker, who was acting chairman of the transportation safety board when the crash happened, said the seven-year deadline set by Congress after that crash should not be extended.

“Seven years, in my judgment, is a long time and an adequate time to do it,” he said. “The technology is out there. Let’s put it in.”

 

Montana county has had 5 derailments in two years

Repost from The Dickinson Press

Montana county has had 5 derailments in two years

By Amy Dalrymple on Jul 20, 2015 at 11:22 p.m.
An investigator takes photos at the site of a crude oil train derailment on Saturday, July 18 east of Culbertson, Mont. Twenty-two oil tankers derailed, leaking an estimated 35,000 gallons of oil. (FNS Photo by Amy Dalrymple)

CULBERTSON, Mont. — Five train derailments have occurred in less than two years in the northeastern Montana County where crews continue cleaning up after last week’s oil train derailment.

In addition to the two train derailments that occurred last week within a 20-mile stretch of Roosevelt County, two railcars also derailed at Culbertson in February, according to the Federal Railroad Administration database, which is updated through April.

The cause of that incident, which did not cause injuries or release of hazardous material, was attributed to human error, according to information submitted to the FRA.

The area also had two train derailments in 2014, including the derailment of two Amtrak cars in April of that year in the neighboring community of Bainville.

Two people were hurt in the derailment, which caused more than $100,000 in damage to Amtrak equipment and nearly $500,000 in damage to the track, the FRA database shows.

The cause that derailment is listed as “track roadbed settled or soft,” according to information submitted to the FRA.

The other 2014 incident, which involved one railcar that derailed in December at Culbertson, was attributed to a broken wheel, the FRA database shows.

The entire state of Montana had 19 train derailments in 2014, the FRA information shows.

Last Tuesday, nine railcars derailed near Blair, Mont., damaging about 1 mile of track. The cause remains under investigation.

BNSF Railway inspects the track in that area at least four times per week, spokesman Matt Jones said.

The FRA and the Pipeline and Hazardous Materials Safety Administration continued collecting evidence Monday to investigate the cause of Thursday’s derailment involving 22 oil tankers. Four of the derailed tank cars leaked oil, the FRA said, and spilled an estimated 35,000 gallons of oil.

The train was not speeding at the time it derailed, an FRA spokesman said. It was traveling 44 miles per hour in a 45-mph zone, the spokesman said.

BNSF environmental specialists continue to clean up at the site. Oil will be removed from the remaining tank cars in the next several days, and the cars will be removed after that, Jones said.

Crews are excavating contaminated soil, said Daniel Kenney, enforcement specialist with the Montana Department of Environmental Quality, which is monitoring the cleanup. The spill was not reported to have contaminated any water sources and has not threatened human health, Kenney said.

The North Dakota Department of Mineral Resources confirmed Monday that Statoil, the company that owns the oil that was on the train, is in compliance with the state’s oil conditioning order.

The order, which took effect in April, aims to reduce the volatility of Bakken crude oil.

Statoil was meeting the order by operating its equipment at specific temperatures and pressures, said Department of Mineral Resources spokeswoman Alison Ritter. Companies also can comply by submitting vapor pressure tests to the state.

The train with was loaded by Savage Services in Trenton, N.D., and headed to Anacortes, Wash., the FRA said.

Jeff Hymas, a spokesman for Savage Services, said Monday the railcar inspection protocols at the Trenton terminal are consistent with FRA and BNSF requirements.

Amtrak crash highlights neglect of busy rail corridor

Repost from the Centre Daily Times, State College, PA

Amtrak crash highlights neglect of busy rail corridor

By Curtis Tate, McClatchy Washington Bureau, May 13, 2015
Amtrak Crash
An aerial photo Wednesday, May 13, 2015, in Philadelphia, shows the scene after a fatal Amtrak derailment Tuesday night, in the Port Richmond section of Philadelphia. PATRICK SEMANSKY — AP

— The derailment of an Amtrak train in Philadelphia this week has renewed attention to the safety and infrastructure challenges facing the nation’s busiest passenger rail corridor.

As investigators began reviewing the data from the locomotive event recorder and collecting other key pieces of evidence to determine the cause of the derailment, information emerged Wednesday that the train had been traveling around a sharp curve at twice the posted speed when it left the tracks.

The accident coincided with a debate in Washington over funding for Amtrak. On Wednesday, the House of Representatives Appropriations Committee voted to cut Amtrak’s annual subsidy from $1.4 billion to $1.1 billion. Further, Amtrak’s authorizing legislation expired two years ago and hasn’t been renewed.

Congress funds Amtrak from year to year, making it difficult for the railroad to make needed improvements to aging bridges and tunnels and to the systems that power the trains and keep them out of one another’s way.

“Amtrak’s living on a shoestring,” said Steve Ditmeyer, a former associate administrator for research and development at the Federal Railroad Administration. “Some things are falling through the cracks.”

The seven-car train traveling from Washington to New York derailed after 9 p.m. EDT Tuesday in Northeast Philadelphia. Of the 238 passengers and five crew members on board, seven were confirmed dead Wednesday by Philadelphia Mayor Michael Nutter.

The fatalities included a U.S. naval midshipman and an employee of The Associated Press. The chief executive of an online startup company was missing.

As seen from TV news footage and pictures posted to social media, pieces of the train were strewed askew the track, which bends in a sharp curve in Northeast Philadelphia. Part of the train overturned, and one car was reduced to a twisted heap of shredded metal.

“It’s a devastating scene,” National Transportation Safety Board member Robert Sumwalt said Wednesday morning.

The NTSB confirmed Wednesday afternoon that the train had approached the location of the accident, Frankford Junction, at more than 100 mph. The speed limit there is 50 mph.

Ditmeyer said a Northeast Corridor improvement project in the late 1970s and early 1980s was supposed to straighten out curves, but that got cut from the budget.

Amtrak’s flagship Acela Express has a top speed of 150 mph but rarely reaches it. Numerous curves, bridges and tunnels restrict the speed of all trains on the Northeast Corridor. The speed limit through two tunnels under Baltimore, built in the 1870s, is 30 mph.

According to a five-year plan for the Northeast Corridor published last month, half the line’s bridges were built between 1900 and 1920, and it would take 300 years to replace them at current funding levels.

“These are ancient things,” Ditmeyer said. “They’re well over a hundred years old. They are decaying.”

The twin tunnels under the Hudson River in New York, built in 1910, sustained heavy flood damage from Hurricane Sandy in 2012. Tens of thousands of commuters depend on them every day, and Amtrak President and CEO Joe Boardman has said they need to be replaced soon.

“I don’t know if it’s seven (years). I don’t know if it’s four or less,” Boardman said in an interview last year. “We’ve got to do it. The nation has to do it. We have to find the money.”

Amtrak is in the process of installing a collision-avoidance system by year’s end on the Boston-to-Washington Northeast Corridor. The system, called positive train control, is designed to prevent trains from exceeding speed limits as they approach curves.

Ditmeyer said the Northeast Corridor was long ago equipped with a system called automatic train control. While that system prevents trains from running past stop signals, it doesn’t correct for excessive speed ahead of curves.

Congress mandated positive train control in 2008 for much of the nation’s rail network, and some lawmakers are floating a three- to five-year extension for its installation.

Unlike Amtrak’s long-distance trains, which are diesel powered, the Northeast Corridor is electrified. But the system of overhead wires and supports that supplies power to the trains dates to the Great Depression.

Amtrak’s five-year plan for the corridor says 62 percent of the overhead wires and 42 percent of the steel supports need to be replaced.

The plan also notes that the economic cost of losing service on the Northeast Corridor could reach $100 million a day. As of Wednesday afternoon, Amtrak service was still suspended between New York and Philadelphia.