Tag Archives: Union Pacific Railroad

Butte County CA: Excellent staff report to Board of Supervisors

Repost from the Chico Enterprise-Record
[Editor: Here is the Agenda for the January 13 Butte County Board of Supervisors meeting.  See item 5.03, scheduled for 10:05 am, including a Staff Report and a PowerPoint Presentation.  I highly recommend the Staff Report, which contains two substantive draft letters, addressed to the Governor’s Office of Emergency Services and the California Public Utilities Commission. The Powerpoint is also excellent  (more reliably viewable here as a PDF).  JAN. 13 UPDATE: see Butte County seeks help dealing with oil train derailments.  – RS]

Supervisors to hold hearing on oil train derailment risks

By Roger Aylworth, 01/08/15
Black tanker cars are a common sight on the railroad that follows the Feather River in the canyon above Lake Oroville. Courtesy of Jake Miille
A train laden with black tanker cars enters a tunnel in the Feather River Canyon, near Highway 70 above Lake Oroville. Courtesy of Jake Miille

OROVILLE >> With trains loaded with a particularly volatile form of light crude oil coming through the Feather River Canyon, Butte County officials are preparing for “derailments or other unplanned releases” of the oil.

A public hearing on the topic is scheduled to take place at 10:05 a.m. Tuesday as part of the regular meeting of the Butte County Board of Supervisors.

The potential for derailments and spills in the canyon was underscored in late November when 11 cars of a westbound Union Pacific Railroad freight train went off the tracks about 20 miles west of Qunicy.

The derailed cars slid down the embankment toward the North Fork of the Feather River, spreading their load of corn over the hillside. Some of the corn, which was being taken to the southern Central Valley, made it into the river.

At the time the a spokesman for Union Pacific stressed the point that nobody was hurt and no hazardous materials released due to the derailment.

The derailment took place in Plumas County, and Plumas County Director of Emergency Services Jerry Sipe told this newspaper it could have been a different scenario if the same 11 cars had been tankers carrying Bakken crude oil.

The Plumas official explained that Bakken crude is a very light oil produced in North Dakota and Montana that has an “explosive potential” more like gasoline than say Texas crude.

Sipe said, “I think it is in fact a reminder, if not a wake-up call,” that trains going through the Feather River Canyon face flooding, rock slides and other potential derailment hazards, and the more trains carrying any kind of hazardous material in the canyon, the greater the chance of a derailment.

An agenda document related to Tuesday’s hearing before the Butte board, says the county Office of Emergency Management, Fire Department and hazardous materials team are preparing for such accidents.

 

The Fight to Stop a Boom in California’s Crude by Rail

Repost from The Huffington Post
[Editor: Our friend here in Benicia, Ed Ruszel, has been featured in numerous online blogs and news outlets in this story by Tara Lohan.  This is an abbreviated version.  The article mistakenly gives a link to The Benicia Independent rather than Benicians for a Safe and Healthy CommunityBSHC can be found at SafeBenicia.org.  – RS]

The Fight to Stop a Boom in California’s Crude by Rail

By Tara Lohan, 01/08/2015

Ed Ruszel’s workday is a soundtrack of whirling, banging, screeching — the percussion of wood being cut, sanded and finished. He’s the facility manager for the family business, Ruszel Woodworks. But one sound each day roars above the cacophony of the woodshop: the blast of the train horn as cars cough down the Union Pacific rail line that runs just a few feet from the front of his shop in an industrial park in Benicia, California.

Most days the train cargo is beer, cars, steel, propane or petroleum coke. But soon, two trains of 50 cars each may pass by every day carrying crude oil to a refinery owned by neighboring Valero Energy, which is hoping to build a new rail terminal at the refinery that would bring 70,000 barrels a day by train — or nearly 3 million gallons.

And it’s a sign of the times.

Crude-by-rail has increased 4,000 percent across the country since 2008 and California is feeling the effects. By 2016 the amount of crude by rail entering the state is expected to increase by a factor of 25. That’s assuming the industry gets its way in creating more crude-by-rail stations at refineries and oil terminals. And that’s no longer looking like a sure thing.

Valero’s proposed project in Benicia is just one of many in the area underway or under consideration. All the projects are now facing public pushback–and not just from individuals in communities, but from a united front spanning hundreds of miles. Benicia sits on the Carquinez Strait in the northeastern reaches of the San Francisco Bay Area. Here, about 20 miles south of Napa’s wine country and 40 miles north of San Francisco, the oil industry may have found a considerable foe.

2015-01-08-16000050785_df993da9dc_z.jpg

Photo by Sarah Craig

A recent boom in “unconventional fuels” has triggered an increase in North American sources in the last few years. This has meant more fracked crude from North Dakota’s Bakken shale and diluted bitumen from Alberta’s tar sands.

Unit trains are becoming a favored way to help move this cargo. These are trains in which the entire cargo — every single car — is one product. And in this case that product happens to be highly flammable.

This is one of the things that has Ed Ruszel concerned. He doesn’t think the tank cars are safe enough to transport crude oil in the advent of a serious derailment. If a derailment occurs on a train and every single car (up to 100 cars long) is carrying volatile crude, the dangers increase exponentially. In 2013, more crude was spilled in train derailments than in the prior three decades combined, and there were four fiery explosions in North America in a year’s span, the worst being the derailment that killed 47 people and incinerated half the downtown in Lac Megantic, Quebec in July 2013.

Public Comments

In Benicia, a Draft Environmental Impact Report (DEIR) regarding the Valero project was released in June 2014 and promptly slammed by everyone from the state’s Attorney General Kamala Harris to the local group Benicians for a Safe and Healthy Community because it left out crucial information and failed to address the full scope of the project.

One of the biggest omissions in Valero’s DEIR was Union Pacific not being named as an official partner in the project. With the trains arriving via its rail lines, all logistics will come down to the railroad. Not only that, but the federal power granted to railroad companies preempts local and regional authority.This preemption is one of the biggest hurdles for communities that don’t want to see crude-by-rail come through their neighborhoods or want better safeguards.

The DEIR also doesn’t identify exactly what kind of North American crude would be arriving and from where. Different kinds of crude have different health and safety risks. Diluted bitumen can be nearly impossible to clean up in the event of a spill and Bakken crude has proved more explosive than other crude because of its chemical composition. It’s likely that some of the crude coming to Valero’s refinery would be from either or both sources.

Public comments on the DEIR closed on Sept. 15, and now all eyes are on the planning department to see what happens next in Benicia.

But the Valero project is just the tip of the iceberg in California.

In nearby Pittsburgh, 20 miles east of Benicia, residents pushed back against plans from WestPac Energy. The company had planned to lease land from BNSF Railway and build a new terminal to bring in a 100-car unit train of crude each day. The project is currently stalled.

But Phillips 66 has plans for a new rail unloading facility at a refinery in Nipomo, 200 miles south of the Bay Area in San Luis Obispo County, that would bring in five unit trains of crude a week, with 50,000 barrels per train.

Further south in Kern County in the heart of oil country, Plains All American just opened a crude by rail terminal that is permitted for a 100-car unit train each day. Another nearby project, Alon USA, received permission from the county for twice as much but is being challenged by lawsuits from environmental groups.

Closer to home, unit trains of Bakken crude are already arriving to a rail terminal owned by Kinder Morgan in Richmond. Kinder Morgan had been transporting ethanol, but the Bay Area Air Quality Management District allowed Kinder Morgan to offload unit trains of Bakken crude into tanker trucks.

2015-01-08-15812706088_224545d0cb_z.jpg

Photo by Sarah Craig

With all this crude-by-rail activity, some big picture thinking would be helpful. As Attorney General Kamala Harris wrote about the Benicia project, “There’s no consideration of cumulative impacts that could affect public safety and the environment by the proliferation of crude-by-rail projects proposed in California.”

A longer version of this story appeared on Faces of Fracking.

CBS News: Kansas derailment raises vital rail safety questions

Repost from CBS News
[Editor: Apologies for the commercial ad in the otherwise excellent video.  – RS]

Kansas derailment raises vital rail safety questions

January 3, 2015

Rail safety is back in the spotlight after a new warning from federal regulators.

The National Transportation Safety Board is urging railroads to take immediate action following its investigation of a derailment in Kansas. No one was hurt in the derailment, but it raised new questions about whether America’s rail network — carrying cargo and passengers — is as safe as it could be, CBS News’ Mark Albert reports.

The collision in September between two Union Pacific freight trains in Galva, Kansas, may have come down, in part, to a light bulb.

In a news release Friday, the NTSB said a green LED light was so bright it out-shined the old-fashioned, incandescent red stoplight nearby. The engineer accelerated, plowing into an oncoming train.

The NTSB now wants all railroads to eliminate any lighting hazards nationwide. It’s the latest in a string of safety issues in the past 18 months on America’s 140,000 miles of rails.

“What we know is the regulators are behind the curve,” said former NTSB chair Deborah Hersman, who sounded the alarm about crude oil shipments in April. “We’re losing cars. We’re losing millions of gallons of petroleum, and we aren’t prepared.”

Eight days later, train cars carrying crude oil derailed and caught fire along the James River in Virginia.

In December 2013, a derailment in North Dakota caused a huge fireball. And in July 2013, 47 people died after a derailment in Quebec, Canada. The train was carrying oil from North Dakota’s booming Bakken oil region.

McClatchy correspondent Curtis Tate acknowledges that the government and the railroads are making strides to make rail travel safer.

“Absolutely, they are,” he said. “The problem is it was too late for 47 people in Quebec.”

Tate published an investigation this week that found gaps in rail oversight, including:

The government lets railroads do their own bridge inspections.
There is no federal database on those bridge conditions, like there is with roads.

New rules that make railroads tell states when large oil shipments pass through only apply to higher-risk Bakken crude — not other types of oil.

“I’d like to think that they’re doing the best they can,” Tate said. “But the question is, will that be enough?”

In a statement to CBS News, the Association of American Railroads said the industry spends half a billion dollars per week on safety.

The Department of Transportation is expected to issue new federal rules by spring that may include stronger tank cars, tighter speed restrictions and tougher braking requirements.

The pros and cons of a controversial California oil-by-rail project

Repost from NewTimes, San Luis Obispo, California

A crude proposal: The pros and cons of a controversial Phillips 66 oil-by-rail project

By Rhys Heyden, December 31, 2014

When viewed from the proper angle, the central conflict here bears a peculiar type of poetic symmetry: A local refinery would like to transport much of its crude oil into San Luis Obispo County via train, while opponents would prefer such plans to be driven out of the county on a rail.

Many stakeholders adamantly support the project, while many locals virulently oppose the proposed rail spur that would allow this transportation method to materialize. There are plenty of lawyers involved and lots of money tied up in each side of the issue, and the project itself reaches far beyond the borders of SLO County.

Originally proposed in mid-2013, the Phillips 66 rail spur extension project has remained largely unchanged: Succinctly put, the company wants to begin construction of a rail spur at its Santa Maria Refinery in Nipomo, thereby giving the facility the newfound ability to receive oil via rail.

It’s a project that appears simple on the surface, but gains layers of complexity the closer one looks. It also touches on several national issues: railroad safety, energy independence, and regulation vs. free enterprise, to name a few.

Ultimately, SLO County officials will likely be making vital yea or nay decisions about the Phillips 66 rail spur extension project in the next few months.

New Times spoke with many stakeholders and experts; examined documents, reports, and public comments; and traveled to Nipomo, all in the interest of answering the basics: What is this project, and why should SLO County residents support or oppose it?

The project

The primary thrust of the rail spur project is fairly simple: construction of a rail spur facility that would allow the refinery in Nipomo to receive crude oil via rail. Currently, the facility receives oil only by pipeline.


NIPOMO JUNCTION
The rousing debate over a proposal to bring crude oil by rail to the Phillips 66 Santa Maria Refinery in Nipomo (pictured) looms large on the national and local political stages.
PHOTO BY KAORI FUNAHASHI

According to the most recent environmental impact report (EIR) for the project, the trains arriving at the refinery would be capped at five per week, or 250 per year. Each train would consist of three locomotives, two buffer cars, and 80 tank cars, and total oil capacity per train would be between 49,670 and 53,532 barrels.

Averaged out over seven-day weeks, the daily oil delivery by rail would be between 35,478 and 38,237 barrels. To contextualize, each barrel of oil is equivalent to 42 gallons.

Precisely how this oil would arrive to SLO County is anyone’s guess. The EIR posits that the oil trains could enter California at any one of five different locations, and could arrive at the refinery from the north or the south on Union Pacific’s Coast Line (which runs from the Bay Area to Los Angeles).

“With this Phillips 66 project, we would deliver crude oil because—as a common carrier—if a customer wants us to move that kind of product, we are federally required to do so,” said Aaron Hunt, a UP spokesman based in Omaha. “It’s a ‘wait and see’ about how we move the oil, though. Nothing is stationary.”

Currently, there’s only one crude oil train that moves through (but doesn’t stop in) SLO County, running from San Ardo to Los Angeles two to three times per week.

“Rail traffic on the UPRR Coast Line through San Luis Obispo County is relatively light,” the project EIR notes. “The average number of freight trains running the length of the Coastal Route is about two per day.”

Another significant component of the project is the physical spur itself. Proposed in the project is the construction of five parallel tracks and an unloading rack extending eastward from the facility, but staying entirely within the boundaries of the refinery property.

The project EIR estimates that the process of arriving, unloading, and departing from the refinery would take between 10 and 12 hours per train, contingent upon Union Pacific scheduling.

Although a great deal of oil would arrive at the refinery via rail were this project approved, the refined product would continue to leave the facility as it currently does—by pipeline to Phillips 66’s linked Rodeo facility in the Bay Area.

In addition, the total amount of material processed at the refinery would remain the same, as that level is capped by county authorities.

“Phillips 66 is working to ensure the long-term viability of the Santa Maria Refinery and the many jobs it provides,” said Houston-based company spokesman Dennis Nuss. “Our plans for this project reflect our company’s commitment to operational excellence and safety while enhancing the competitiveness of the facility.”

The review process

Despite an initial push for a speedy turnaround by Phillips 66, the rail spur project has encountered several significant obstacles and delays as it’s rolled through SLO County’s review process.

The project’s initial draft EIR (DEIR) was released on Nov. 27, 2013, to relatively little fanfare, but word spread quickly in environmental activist circles, as well as among Nipomo residents. Soon enough, hundreds of public comments critiquing the project from near and far flooded the SLO County Planning and Building Department.

Murry Wilson—an environmental resource specialist and the planning department’s point man on the project—told New Times in March 2014 that his department was overwhelmed by the roughly 800 public comments that had come in regarding the project’s DEIR.

“Many of the comments were really substantive, and the nature of the project has changed enough as a result of those comments that the DEIR could no longer provide an appropriate review for the project,” Wilson said at the time. “Making sure the public has access and a chance to respond to new information is the key thing here.”

Under Wilson’s advisement, the county pushed for recirculating the DEIR to adequately respond to those “substantive” comments, and Phillips 66 (which is funding the review process) agreed to the additional expense and subsequent elongation of the review process on March 24.

At 708 dense pages, that initial 2013 DEIR was no lightweight, but the re-circulated DEIR—which debuted on Oct. 10—weighed in at an even heftier 889 pages.

The public comment period for that second report closed on Nov. 24, and the county and the DEIR consultants have since been sifting through, organizing, and bracketing the nearly 11,000 comments they received on their second go-round.


THE PROPOSAL
This is an aerial map of the rail spur extension project and environs. Outlined in yellow is the boundary of Phillips 66’s property, in black is the Union Pacific mainline railroad, in blue is the outline of the proposed rail spur, and in red is where a pipeline would run from the spur to the refinery.
PHOTO COURTESY OF SLO COUNTY PLANNING DEPARTMENT

Though the vast majority of the comments came in as individually signed form letters from about five different environmental activist groups, several hundred unique comments from individuals, governmental agencies, organizations, schools, and even Phillips 66 poured in.

The majority of the comments are critical of the project, but there are also many letters that are either neutral or in support of the proposal.

The review process, as Wilson explained to New Times, is in its final stages. Essentially, the project consultants need to adequately respond to all public comments and draft a final EIR including those responses. Wilson had set a mid-January goal for completion of that process, and he said everyone involved is still striving to hit that target.

The first public hearing for the rail spur project—at the SLO County Planning Commission, where public officials will finally get the chance to vote yes or no on Phillips 66’s project—had been slated for Feb. 5, but Wilson said that hearing will likely be bumped.

“The sheer volume of comments we received is probably going to delay the hearing date,” he explained. “Feb. 19 would be the next possible Planning Commission date, and that’s possible; it just all depends on the depth in which our consultants may need to do their responses and/or additional analysis.”

Asked about the potential for yet another DEIR recirculation, Wilson said he’s “pretty confident we’re not going down that path,” adding that he wants to set this project for a hearing and wrap up the review process ASAP.

Pros

So, now that you have a pretty good idea about the nature of this project and what’s happened up until now, you’re probably still wondering why you should—or shouldn’t—support it.

Seeking to understand why many people support the project, New Times reached out to Phillips 66 to get their point of view.

Though New Times requested a tour of the refinery and access to speak with a variety of Phillips 66 employees, the company—working with SLO-based PR firm Barnett Cox & Associates—declined to provide either, instead offering a presentation and interview with two company spokespeople.

In a roughly 90-minute conversation between two reporters, refinery Maintenance Superintendant Jim Anderson, a Barnett Cox rep, and company spokesman Nuss via telephone, Phillips 66 laid out its case for project approval.

Essentially, Nuss and Anderson argued that oil production in Santa Barbara County (the refinery’s predominant current source of oil at about 65 to 80 percent of total sourcing) is in decline. Anticipating further falloff, the company wants to diversify how it receives oil and where it receives it from.

This rail spur project and receiving oil by rail, they posit, will allow the Santa Maria Refinery (and the 135 or so local jobs it provides) to stay viable for decades to come.

When asked if Phillips 66 has ever considered shutting down the refinery or if the company would abandon the refinery if the rail spur wasn’t approved, Nuss said such discussions hadn’t occurred, adding that the company “will not speculate about the project.”

Anderson added that “our options would start to become really limited” if the rail spur project doesn’t move forward.

Oil by rail, Nuss and Anderson argued, is already a reality across the nation and even in SLO County (with the established San Ardo to L.A. train), and they pointed out that Union Pacific is doing quite a bit to make sure its tracks are safe for crude oil trains.

Lastly, Nuss and Anderson added that residents have raised legitimate concerns about environmental impacts (noise, lights, emissions, and the potential for spills), but they opined that such impacts will be adequately mitigated wherever they can be.

“The refinery is good for us. It provides high-paying jobs, is a great neighbor, and is a longtime business that needs to keep operating,” Anderson wrote in a letter supporting the project. “The draft EIR spells out the way issues like noise, lights, and particulate emissions can be managed, and with these points taken care of, there is no reason to deny the application.”

“Protecting our people, our environment, and our communities guides everything we do, and those values will be applied to this project as well,” Nuss wrote in a follow-up email to New Times.

It’s worth noting that Phillips 66 employees are not the only ones supporting the company’s endeavor.

“The Phillips 66 Santa Maria Refinery has been quietly doing its job for 60 years, and what I have observed is a business that operates safely and with respect for our community,” Cuesta College President Gil Stork wrote in a Nov. 19 letter supporting the project. “We all have to adapt to changing market conditions to survive, not every one’s changes are subject to the scrutiny the refinery is managing. The draft EIR is long and thorough and addresses every detail of the project.”

This is the crux of the pro-rail spur argument: shouldering a few additional (mitigated) environmental impacts for the sake of keeping well-paying refinery jobs in SLO County and respecting a longstanding community-member.

Cons

If Phillips 66’s measured, cautious, and calculated approach to supporting its own project is at one end of the proverbial spectrum, then the aggressive, kinetic, and fiery opposition to the project is its natural polar opposite.

Project adversaries include prominent environmental groups (the Sierra Club, ForestEthics, and Communities for a Better Environment among them) and city councils as far-spread as Berkeley, Richmond, and Moorpark. But perhaps the most representative group of all is a small, local assembly of project opponents: the Mesa Refinery Watch Group (MRWG).

During a December trip to Nipomo, MRWG steering committee members Martin Akel, Gary McKible, and Laurance Shinderman (as well as MRWG member Paul Stolpman) met with New Times to demonstrate and explain exactly why they’re opposed to the project.

“I think of it in terms of the baseball field in Iowa: If you build it, they will come,” Stolpman said. “In this case, if you don’t build it, they can’t come.


INFORMED DISSENT
Gary McKible (left) and Laurance Shinderman (right) are steering committee members of the Mesa Refinery Watch Group (MRWG), an assembly of local residents opposed to the rail spur extension project.
PHOTO BY KAORI FUNAHASHI

“If you don’t give them a place to park the trains at the end of the line, they won’t be coming down the line at all,” he added.

In conversations and emails with New Times, MRWG members expounded on the multifarious reasons they think the rail spur is ill-advised. Rationales ranged from visual blight to noise pollution to air pollution to the risk of a catastrophic derailment and/or oil spill at any point on the tracks.

Unsurprisingly, MRWG members also disagreed with what they see as “specious” arguments from Phillips 66. They feel that the company has not been a good neighbor and is pursuing the crude-by-rail strategy primarily to enhance profits, not because any refinery jobs or the local oil supply are truly at risk. In fact, they view those rationales as red herrings.

“Phillips wants to make the Central Coast a hub for crude by rail, and I feel like that’s pretty obvious,” Akel said. “That said, our worst enemy isn’t Phillips, it’s an uninformed public. People need to know.”

One larger group working toward that same end is the Sierra Club. Andrew Christie, director of the local Santa Lucia Chapter, told New Times that his organization emphatically objects to the rail spur project.

“There are just no grounds on which to support this project,” he told New Times. “The impacts are understated, the EIR has been deficient from the start, and there are still 11 ‘significant and unavoidable’ impacts in a defective EIR.”

The 11 “significant and unavoidable” project impacts Christie refers to are a touchstone for the MRWG as well—five in the “air quality and greenhouse gases” category and one each in “biological resources,” “cultural resources,” “hazards and hazardous materials,” “public services and utilities,” and “water resources” categories.

All of these impacts are essentially due to the potential for high levels of toxic emissions from the oil trains or the mushrooming consequences of a possible crude oil spill and/or derailment.

Driving a New Times photographer and reporter around Nipomo, McKible and Shinderman—when not kibitzing back and forth—were adept at pointing out which neighborhoods and homes would potentially bear the brunt of noise, light, and pollutant impacts from the spur.

Eventually, they pulled over to the side of Highway 1 near the Mesa Fire Station, where the metallic frame of the refinery can be seen looming over the dunes.

“There is no benefit with this project—we are all subject to collateral damage with what they’ll be doing up and down the rail line,” McKible said, shaking his head. “We derive no benefit, and we take on all the risk.”

The battle for support

As the rail spur project review process wraps up and actual yea or nay votes are looming, indications are everywhere that the war for public opinion (and the favor of elected officials) has kicked into high gear on both sides—but especially on Phillips 66’s behalf.

On Oct. 24, Union Pacific scheduled two “invitation-only” sessions to see a “state-of-the-art interactive training car that will travel the U.S. teaching safety and emergency preparedness.”

In an email sent to many SLO County officials advertising the event, organizers noted that “Phillips 66 Santa Maria Refinery is delighted to invite you to tour the training car, and see a crude oil railcar that we are bringing to San Luis Obispo to help educate community leaders about our proposed rail project.”

On a separate note, in a Dec. 15 letter in the Tribune, SLO resident Amber Johnson took aim at the multitude of form letters from environmental groups responding to the DEIR, castigating them as “out-of-town special interest groups who clearly have their own agenda.

“The only special interest I pay attention to is that of the health and prosperity of San Luis Obispo County by supporting responsible businesses such as Phillips who wish to continue to contribute to our local economy,” Johnson concluded. “This decision needs to be based on what is best for our county, not what outsiders think is best.”

Johnson is herself a political strategist who was a regional field director for the oil company-sponsored “No on P” campaign in Santa Barbara County, a former campaign manager for newly-elected SLO County District 4 Supervisor Lynn Compton, and a former executive director of the Republican Party of SLO County.

Lastly, on Dec. 19, Phillips 66 made a splash with a $30,000 donation to the fledgling San Luis Obispo Railroad Museum.

The Paso Robles Daily News quotes Bill Schroll, manager of the Santa Maria Refinery, as saying that, “All of us involved in the oil industry are aware of the role the local railroad played—and continues to play—in keeping our product moving.

“We are delighted to help educate residents and areas visitors about the rich history of the railroads and their role on the Central Coast, including the dynamic partnership that continues between our industries,” he concluded.

Unsurprisingly for a project of this magnitude, many politicos polled by New Times said they saw the rail spur project likely being appealed by one side or the other—from the Planning Commission, to the Board of Supervisors, to the California Coastal Commission (the refinery is in the coastal zone)—and then likely being settled in court in a years-long struggle.

What remains to be seen, however, is precisely which arguments will emerge, and which side of the issue will be fighting an uphill battle.

“Ultimately, it comes down to this: Is what they’re proposing appropriate for the community, or are the impacts just too great?,” said District 3 Supervisor Adam Hill. “It will be interesting to see how that question is answered.”