Category Archives: Valero Crude By Rail

Vallejo Times-Herald: State officials say Benicia underestimated oil train risks

Repost from The Vallejo Times-Herald

State officials say Benicia underestimated oil train risks

Officials urge city to redo Valero refinery project safety analysis
By Tony Burchyns, 09/25/2014

State officials say Benicia has underestimated the risks of running oil trains through Roseville and other parts of Northern California to the Valero refinery.

In letter to the city last week, officials from the state Department of Fish and Wildlife’s Office of Spill Prevention and Response and the Public Utilities Commission called on the city to redo its safety analysis before allowing the refinery to receive two 50-car oil trains a day.

The letter follows similar critical comments from the Sacramento Area Council of Governments, the cities of Davis and Sacramento and the University of California at Davis. Environmental groups such as the Natural Resources Defense Council and San Francisco Baykeeper also have sent letters to Benicia expressing concerns about the project.

The state officials’ letter said that total potential derailments attributable to the plan, including those outside California, should be considered in the risk study. Officials also said that the city’s draft environmental impact report paid insufficient attention to train accidents other than derailments.

“The analyses of environmental impacts, including the risk and consequences of derailments, should not be limited to the section of track between Roseville and Benicia, and track at the refinery itself,” officials wrote. “The analyses should also cover the many miles of track, the distance of which will vary depending on entry point into the state, between the state border and Roseville.”

Valero’s project description identifies North America, Texas and other locations as possible sources of crude, but direct routes through Southern California and other areas of the state and country are not analyzed.

City officials have said their analysis was limited to the Union Pacific line between Benicia and Roseville because the other rail routes are unknown or haven’t been disclosed.

The letter also criticized the city’s finding that the risk of train spills of more than 100 gallons between Rosville to Benicia would be once in 111 years. Critics have said the analysis is flawed because it relies on rail safety data that predates the nation’s crude-by-rail boom.

The letter asserts that the city’s derailment and accident rate calculations are problematic and the legal enforceability of Valero’s commitment to use tank cars that meet that highest safety standards is unclear.

Benicia has declined to comment thus far on the numerous letters received during the report’s public comment period that ended Sept. 15. However, the city plans to respond to the comments before the project’s next public hearing, which has yet to be set.

Benicia Valero Crude-by-Rail comment period closes with a landslide of criticism

By Roger Straw

The Benicia Independent makes it easier for you to read comments of INDIVIDUAL state and regional agencies and organizations. See our updated Project Review page (or just see below).

Something UNUSUAL happened in Benicia on September 15, the final day of the public comment period on the Draft EIR on Valero’s Crude By Rail proposal. I understand that opponents of a project will almost always wait until the last day to submit public comments. But not only did a remarkable NUMBER of critical comments arrive in the City of Benicia’s inbox on September 15 – there was a dramatic landslide of comments from significant governmental agencies and environmental organizations, including…

Also highly significant on September 15 were written comments from four of Benicia’s Planning Commissioners: Steve Young, George Oakes, Susan Cohen Grossman and Belinda Smith.

Prior to September 15, the City also received critical comments from the

These documents are also downloadable from Project Review.

Diane Bailey: Valero’s Promise to Benicia: We’ll only have an environmental disaster once every 111 years

Repost rom NRDC Switchboard, Diane Bailey’s Blog

September 17, 2014

Valero’s Promise to Benicia: We’ll only have an environmental disaster once every 111 years.

Diane Bailey

Actually, that’s kind of worrisome, especially considering that if you don’t experience that disaster yourself, your kids probably will.  This is one of the many absurd elements showing Valero’s cavalier attitude toward public safety in the draft Environmental Impact Report (EIR) for its proposed crude by rail project, for which public comments were due this week.  The hazard analysis in this report is also a serious underestimate, according to the State among many others: The California Public Utilities Commission notes the serious failure of Valero to address the “potential for tragic consequences of crude oil tank car ruptures” from its proposed Crude by Rail Project.

casselton ND 12 30 13.jpg
Valero’s Promise to Benicia: We’ll only have an environmental disaster once every 111 years

This dangerous crude project is so riddled with problems that many communities up-rail are now voicing serious concern.  The City of Sacramento highlights the high concentration of people around the rail freight lines (“more than 147,000 City residents live within ½ mile”) serving the “Valero Benicia refinery [which] is one of two California refineries that are in the process of securing permits to build rail terminals to import Canadian tar sands and Bakken crude oils.” (emphasis added)  And the City of Davis suggests that the “highest levels of protection [be implemented] before disasters such as hazardous material releases and explosions occur [so that] we can avoid having such disasters in the first place.”

Benicians for a Safe and Healthy Community explain why the project is fatally flawed with 132 pages of concerns.  Valero’s crude by rail proposal is like so many other projects popping up all over the nation in a mad rush to access cheaper, extreme and dangerous crude oils, with little regard for public health or safety.  This project is a total disaster (based on NRDC, CBE and other comments) because it brings:

  • More Refinery Pollution: Bringing in extreme crudes like tar sands and fracked Bakken crude will only increase refinery pollution.  Valero’s Benicia refinery already releases 70 percent more toxic chemicals than the average for California.
  • Toxic Plumes Along Rail Lines: This thing called “crude shrinkage” happens during transport, where entrained gases escape, leading to a 0.5 to 3 percent loss of crude oil.  It’s a big problem for volatile crude oils like Bakken, and coupled with the high benzene levels found in some North American crudes (up to 7%), it creates a serious toxic plume around rail lines.  For instance, we estimate over 100 pounds per day of excess benzene emissions from the Valero proposal in the Bay Area (or 1800 times more than the draft EIR reports).
  • Extreme Crudes are Dangerous: Valero and other oil companies pretend that they can mix extreme crudes like tar sands and fracked Bakken into the ideal “Alaskan North Slope look-alike” crude, which sounds great, except that it doesn’t work that way in reality.  Both Bakken and tar sands carry their dangerous properties into any crude oil blend making it more volatile, toxic, and corrosive.
  • CBR Terminals at Refineries Amplify the Hazard: Valero proposes to site its crude by rail unloading facility within 150 feet of a number of very large refinery tanks that store highly flammable and potentially explosive material.  If a derailment occurred at the terminal, it could set off a chain reaction of fire and explosions at the refinery.  And there have been three derailments in Benicia outside the Valero refinery in the past year; luckily those trains were carrying petroleum coke, not crude oil.
  • Risk of Catastrophic Accidents All Along the Rail Route:  Valero’s “Barkan report” that estimates a release only every 111 years from the proposed 100 daily tank cars carrying crude is absurd for many reasons.  Most egregious is that it fails to consider recent data, like the six major crude oil train accidents over the past year that have resulted in massive fireballs and destruction, including 47 casualties in Lac Mégantic. The safety risks to tens of thousands of people living around these freight rail lines remains grave.

The oil industry has been promoting “look-alike” crudes that attempt to mimic conventional crude by blending extreme bottom of the barrel crudes.  The mile-long trains laden with these extreme crudes are a Trojan horse that puts millions of Californians at risk and threatens to undo several decades of environmental progress.  We need a moratorium on all new crude by rail projects, including Valero-Benicia, until the state can assess the cumulative impacts of these projects, make sure environmental impacts are fully mitigated and assure communities that they will be safe.

Cool Davis: a final landslide of important letters on Valero DEIR

Repost from Cool Davis

Valero DEIR Comments are Successful

By Lynne Nittler

Lynne Nittler led the Davis effort to send comment letters on the Valero DEIR.
Lynne Nittler led the Davis effort to send comment letters on the Valero DEIR.

The DEIR comments for the Valero Crude-by-Rail Project in Benicia closed on September 15, with a final landslide of important letters critical of the project arriving on the last day. Attorneys and others who have looked at the quality and quantity of the comments submitted believe at the very least the DEIR will have to be significantly revised to address the many serious issues raised, and then recirculated. They expect the analysis to take many months.

This is an example of an entire region coming together to respond to a serious threat to our safety and taking advantage of the California Environmental Quality Act (CEQA) process to voice our many concerns before the project proceeds. The process is respectful and orderly, and allows governmental agencies, environmental organizations, and individuals all to respond. The responses range from detailed technical analysis of many pages according to the expertise of the agency, often relying on expert scientists and sometimes policy, to more personal or general concerns from the public at large. In addition, public testimony was taken at three lengthy Planning Commission meetings in July, August, and September, all of which can be accessed at the city site below. Finally, the Benicia Planning Commissioners themselves submitted written comments.

CEQA is a stunning example of democracy in action, and in the case of the Valero Crude-by-Rail Project, all concerned parties utilized the channel available to them to look closely at the short and long-term impacts of Bakken Crude and tar sands bitumen entering the state of California via rail.

All comments are added to the public legal record and incorporated as part of the review of the DEIR, and thus all concerns must be addressed in the final EIR. Furthermore, any item entered in the record can be used in future litigation.

The comments can all be read by order of the dates they were submitted at here   In each batch posted, the organizations are listed first, followed by letters from individuals. Be patient, as the large files are slow to open.  An easier, faster site to view the submissions can be found here

A few highlights of the hundreds of pages of commentary follow.

Governmental Agencies:
In the Sacramento region, our governmental agencies stepped forward on our behalf. Yolo County addressed the concern of the magnitude of an accident should one occur, among a range of other considerations about transport over the causeway. Read them here.

The Sacramento Area Council of Governments (SACOG) on behalf of 22 cities and 6 counties raised a series of concerns including advance notification to emergency operations offices of crude oil shipments, limitations on storage of crude oil tank cars in urbanized areas, funding for training and outfitting emergency response crews, installing the best brakes to minimize risks, funding for rail safety projects, installing Positive Tran Controls to prevent accidents, and prohibiting shipments of unstabilized crude oil that has not been stripped of the most volatile elements (including flammable natural gas liquids). Read the full letter here.

The City of Davis concurred with the SACOG and County of Yolo letter concerns and added some specific considerations for trains passing through Davis. In particular, the letter states that the DEIR’s Project description is incomplete and misleading as written, given information about the use of 1232 tank cars and assumptions about “just-in-time” supply chain and the significant sidings that could be used for storage.

The letter also states that the DEIR inadequately describes the project setting as it gives no details about all the uprail cities the trains must pass through with their crude oil loads. Next, the DEIR improperly truncates its description of the project setting by ending the description at Roseville, when at the least the route should be studied to the California borders or better yet to the source of extraction. Clearly the source of the crude does pose a significant hazard to uprail communities that must be addressed in the DEIR.

The Project’s Significant Hazard Risk Requires Feasible Mitigation Measures which are not explored in the present version, and the Davis letter presents a list of possible mitigations. Finally, the City insists that the DEIR fails to analyze the cumulative impacts of the Project given the imminent plans for more daily crude oil trains. Read the full letter here.

The California Public Utilities Commission in conjunction with the Office of Spill Prevention and Response also commented at some length on the DEIR, submitting their letter on Governor Brown’s letterhead. Read the full letter here. The letter addresses issues about the length of track analyzed, the derailment and accident calculations, the legal enforceability of the Valero commitment to use CPC- 1232 tank cars, the total derailments attributable to the project, insufficient attention paid to potential consequences, assumption regarding the number of cars expected to derail and other areas.

Many other governmental agencies including several Air Quality Management Districts wrote letters examining aspects of the DEIR. Just browse the commentary postings.

Environmental Groups
The Natural Resources Defense Council Document is a must read for the environmental group letters submitted! It clearly lays out so many of the flaws with the DEIR! Rather than a summary, go right to the document here!

For a technical review, check in to Communities for a Better Environment or read the San Francisco Baykeeper’s review, or technical reviews by other experts here.

Last but not least, read the letters from Cool Davis on Greenhouse Gas emissions and from 350 Sacramento at the link above.

Individual comments
Finally, many dozens of residents did their best to add their voices commenting on their personal concerns, whether or not they attended the five workshops offered. Some wrote of living close to the railroad tracks and their worries of a derailment and explosion. Others pointed out the noise and vibrations of the daily mile-long trains of heavy tank cars. Others wrote about the potential danger of crude oil trains on tracks that run through areas with earthquake fault lines, and many asked probing questions about the liability and who would cover the costs of accidents and spills. Many were concerned about our water supply as trains cross the mountains and our major rivers. A few raised questions about the cumulative impact of the Valero daily trains in the context of the proposed daily train to Phillips 66 Santa Maria refinery in San Luis Obispo County whose DEIR is to be released this month.

Next Steps
The review period for the federal Department of Transportation proposed safety rules remains open to public comment through September 30. A petition from ForestEthics is available for signatures through September 21.

The DEIR for the proposed recirculated DEIR for the Phillips 66 Rail Spur Project for the Santa Maria refinery in San Luis Obispo that will bring 80 tank cars of crude oil through Davis each day will be released mid-September for a 60-day review period. Watch Cooldavis.org and Yolanoclimateaction.org for ways to respond during the comment period.